Breaking the Ice: Airmen remove snow, resume flying operations
Tire tracks line the snow after Airmen from the 633d Civil Engineer Squadron move snow and ice from the flightline to a designated area, Jan. 23, 2025, at Joint Base Langley-Eustis, Virginia. The installation’s T-38 Talon and F-22 Raptor aircraft required a clear flightline in order to safely take off and land. (U.S. Air Force photo by Tech. Sgt. Cherish Chavez)