Home : News : Photos
We need some space; JBLE conducts facility space plan and optimization study
Danielle Foglesong, left, measures the length of a wall with a laser pointer while Nicole Pellagalle makes notes of the distance on a digital blueprint at the 633rd Civil Engineer Squadron pest management facility at Joint Base Langley-Eustis, Virginia, Nov. 20, 2020. The intent of the facility space optimization plan is to analyze the current usage of 236 facilities at Langley, compare this to the current space requirements for the units within these facilities and develop optimized space solutions for a more efficient JBLE-Langley. (U.S. Air Force photo by Staff Sgt. Chandler Baker)

Photo by: Staff Sgt. Chandler Baker |  VIRIN: 201120-F-JM722-1070.JPG