T-38 pilots perfect F-22 maneuverability
Orlando Vasquez, Mission 1st Support Services contractor, runs through pre-launch procedures at Joint Base Langley-Eustis, Va., Dec. 6, 2016. The procedures include checking flight controls, gauges and pumping air into the aircraft to start the engine. (U.S. Air Force photo by Airman 1st Class Tristan Biese)