New RSC bridges erected at FEVA
FORT EUSTIS, Va. -- The former wooden Bridge #3, along with Bridge #7, was replaced this month with a Recycled Structural Composite bridge. The former bridges had aged to a point of concern in supporting the engines and rolling stock used by the U.S. Army Transportation School during training. (U.S. Air Force photo/Tetaun Moffett)