News Search
Results:
Tag: SrA Areca T. Wilson

April 20, 2017

‘Piering’ into future: Construction to improve fuel operations

Construction preparations for a new pier, which is used to receive jet fuel, began April 3, 2017. The project, which is overseen by the 733rd Logistics Readiness Squadron Fuels Facilities, is expected to be completed in 18 months.

April 12, 2017

Fuel facilities supplies the ‘goods’ on, off flightline

Outfitted in white overalls, gloves, boots, earplugs and a face shield, two U.S. Air Force Airmen cautiously perform their duties while surrounded by a shroud of vapors. They are donned in gear meant to protect them from the very substance that helps to protect lives at high altitudes. The scene resembles that of a science fiction movie— moving in slow motion as the various sounds of the flightline are subconsciously replaced by the eerie sound of shallow breaths in a mask. At Joint Base Langley-Eustis, the Airmen assigned to the 733rd Logistics Readiness Squadron fuels facility perform one of their many responsibilities, ensuring pilots have oxygen at high altitudes.

March 15, 2017

633 CES cartographers: mapping mission success

Standing in a field under the warm, afternoon sun, a U.S. Air Force Airman breaks his gaze as he squints one eye before looking into a device which resembles an oversized Polaroid camera. U.S. Air Force Airman 1st Class Ryan Mundt, 633rd Civil Engineer Squadron engineering technician, was beginning to perform an optical site survey, one of the many duties of the 633rd CES mapping section. The camera he looked through is actually a Total Station, a surveying device used by engineer Airmen during the cartography, or map making process.